On-prem AI · commercial subcontractors

Check it
before you sign off.

Give Redgorge any PDF from the job (plans, specs, an RFI, a submittal, a schedule) and ask it questions. It can run on a box in your building, so nothing under NDA has to be uploaded. Every answer cites its page: the sheet or spec page it came from.

Free set test. Send a closed-out job you already know. Inside five business days you get back what it found, every claim cited to a sheet, and you grade it. If it earns it, a free three-week pilot on your own sets comes next.

In the email: what the job was, roughly how many sheets, and where the set lives now. We reply with how to get it to us.

Straight to us at info@redgorge.com. No form, no sales sequence. If we wrote to you, just reply to that.

Every answer cites its page Can run on a box in your building Mutual NDA on request
redgorge-01 · Pittsburg USD specs LOCAL

CHECKED

Division 23, spec against spec: duct insulation thickness.

NOT A CONFLICT — DIFFERENT SCOPE

The two statements govern different conditions: Section 3.5 A applies to concealed supply and return ducts, while Section 3.5 B applies to exposed supply ducts.

SPEC 231081§3.5.Ap. 307
SPEC 231081§3.5.Bp. 307

Sources on this answer: 2 · Pittsburg USD Bid 24-026

Excerpt of the recorded output from the real run on a public bid document, shown in our panel: 1-1/2 inch against 1 inch looks like a conflict to a keyword search, and it is not one. The whole run is in section 01, the proof.
Specification page 307, section 3.5, with the A and B paragraphs marked: concealed ducts 1-1/2 inch, exposed supply ducts 1-inch minimum. Tag: not a conflict, different scope. Two thicknesses, not a conflict Pittsburg USD bid specs, duct insulation: 1-1/2 inch for concealed supply and return ducts, 1 inch minimum for exposed supply ducts. Both cited to page 307.
Redgorge Reader answering a question about insulation on concealed supply ducts: the one-line answer on the left, and spec page 307 on the right with the cited lines boxed.
Every mark opens the page it came from. A question about duct insulation on the public Pittsburg bid set: the answer, and the spec page it read, with the lines boxed. Public bid set: Pittsburg USD Bid 24-026.

The proof

Every answer comes back with the sheet or the paragraph. Check it yourself in seconds.

The proof 

Every mark opens the page it came from.

Grade us first, free, on a job you already know

Send one closed-out job you already know the answers to: plans, specs, or both. We run it, and inside five business days you get back what it found, every claim cited to a sheet, to grade against what you already know. No fee, and no obligation afterward except telling us the truth about it.

Grade us first, free, on a job you already know 

What we do and what it costs

One task. One number. A fixed price and an end date.

What we do and what it costs 

The work we go after

Every company has a job that is one person, reading, at 11 p.m.

The work we go after 

Why it runs in your building

The systems in your contract went through procurement. An AI service did not.

Why it runs in your building 

About the box, plainly.

Who we are

Twenty years in construction. A decade of it in the model.

Who we are 

RG-KEY · Legend

Keyboard shortcuts

d
Dark mode on and off
t
The free test on a set you already know
p
The proof
c
What it costs
?
This legend

Not every shortcut is on the legend. The missing one turns the set into a blueprint, and anyone who owned a game controller in 1987 already knows it.

With them off, the Shortcuts button in the footer still opens this legend.